Made in China Cleaner equipment high pressure cleaner Pipeline Pigs

Pig Cup It is necessary parts of pipeline cleaning pig, can be split and substitution.

Products Details

Shandong Jute Steel Pipe company established in 2001,now,We are equipped with advanced production equipment,such as hot rolling production line,punching lines,fine rolling production lines and cold drawing production lines.Our company specializes in the production of various seamless steel pipes. Our products include common seamless steel pipes,fine pull pipes,fine rolled pipes,alloy steel pipes,special pipes,sheet steel,Steel pipe deep processing,etc. Our company invites a group of excellent technical experts and management personnel in domestic steel pipe industry to improve the technical levels of our products.Shandong Jute Steel Pipe Co.,Ltd. Contacts: Mr. Ji WhatsApp: +86 18865211873 WeChat: +86 18865211873 E-mail: jutesteelpipe@gmail.com E-mail: juteguanye@aliyun.comThe ability, through the one 0D elbow, ø 114 and above the portable electronic transmitter, when jamming can be through to improve the medium pressure to the broken up. Software pigging maximum deformation is more than 40%, the elongation is greater than or equal to 200% It is suitable for thick fouling and scaling of irregular pipeline pigging descaling, also suitable for combustible gas medium pipeline pigging.
Material Polyurethane
Size 2''-52'' 
Radius of curvature R>=1.5D
Allow pipe deformation 10-15%D
Shrinkrange 5-7%
Medium tem -40-100℃
Business Type Manufacturer
Standard GB150 and ASME certificate 
Purpose Remove the grease in the tube completely.There are three reasons for the tube clogging: First, the pipeline is deformed seriously so that the pig can not pass; Second, the pipeline low-lying dirt and a large amount of dirt be removed too much to cause the front of the pig clogging; Third, in the process of the large foreign body or perforation punch card hard there is objects penetrate the tube. The solution is as follows: 1. Pipeline deformation. Refers to the pipeline or elbow due to stress or external caused by deformation more than 15%. Solution: soft cleaning pig itself deformation of 45%, as long as the pipeline deformation does not exceed 40%, is not the phenomenon of clogging. If the card plug, in 2 to 3 hours to find the clogging position quickly, with pressure hole to remove the pig, replace the deformation pipeline to continue  clear. 2. Pipeline waxing dirt deposition. The front of the pig deposition is too long, the solution: strict control of the number of dirt. The use of soft pig diameter from small to large, step by step method, so that each time the tube with a moderate amount of grease to improve the capacity of the pig, to prevent the pig clogging, such as excessive deposition cause increased pressure,hole with pressure for partial exclusion (in the tube before 300m,the opening or pre-cut in the pipeline at the opening point, hole size Φ90 ~ Φ100). 3. If the foreign body plug, in 2 to 3 hours to find the clogging position quickly, with pressure block off, take out the pig, remove the foreign body to continue to clear.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours